  • What type of foundation is used in the xRange?
    The units are available in a steel and boarded prefabricated floor or concrete raft foundation, dependent on choice and/or site conditions. Please note that cut & fill not included in costings. (Methodology mitigates the need for cut & fill over gentle slopes).
  • Do the xRange units come standard with kitchens & bathrooms?
    The shell costs exclude sanitaryware and kitchen fit-out. These are available according to a choice of schemes available upon enquiry.
  • Is the covered patio included in the shell price?
    Shell price includes a Composite Decked Veranda with louvre covering (Patio sizes as per respective Plans)
  • What else is included in the shell price?
    All Engineering & Architectural services included according to standard schemes offered. All interior fittings; fixtures & equipment are not included. Council submissions are offereed separately.
  • What are some of the standard finishes?
    Aluminium framed windows & doors, OSB / plaster board ceilings and plaster & paint interior finish.
  • What floor finishes are available?
    The Pre-fabricated Steel Foundation offers a choice of OSB, Vinyl or Carpet floor finishes. The Raft Foundations offering can be tiled in addition to vinyl/ carpeting finishes
  • What is the roof specification?
    The units have an insulated Chromadek IBR roof, available in standard colours.
  • What is the electrical specification?
    The units come with an initial electrical specification, that can either be connected to the respective power provider or paired with an appropriate alternative energy solution.
  • Are the xPod units plumbed?
    The xPods are plumbed according to the various plans available, however, will require connecting to preferred water supply and waste water system.
  • How long does a unit take to construct?
    Fabrication time is 4-6 weeks (depending on the xPod model and finishes. Installation time is 3-5 weeks depending on the type of foundation for the xRange units and 2-3 days for standard xPod units.
  • Do I need to submit plans to my local council?
    All dwellings do require council submission. Council submission is not included but this service is offered separately.
  • I may need additional storage space, are there any available options?"
    We do offer garage/storage versions depending on one’s requirements.
  • Can I add extra space or additional rooms onto my xPod unit?
    Yes, naturally this is site dependant but based on our design, one can add / mix & match with the various Units on offer via a glazed passage, where appropriate/ feasible.

Need more info?

Interested in any of the xPod solutions and need more info. Hit us up!

+27 83 308 9660 / +27 83 308 8081

© 2020 by Multiply Holdings Pty Ltd. All rights reserved.

Follow along

  • Instagram
bottom of page